Here, we have a knock through and kitchen installation that we completed in October 2016.

The project involved the removal and bricking up of an external door, as well as removing all the existing kitchen units and wall tiles; followed by removing a load bearing wall, and installing a steel beam in order to provide the required space for the clients new kitchen.

Once the wall was removed and the room was prepared, we then supplied and installed a brand new kitchen from Magnet Trade as per the clients preferred specification and design. Once installed, we made good all of the areas that were affected by the structural alteration, whilst coordinating the 1st and 2nd fix plumbing and electrics. All in all, the entire project took just over 2 weeks to complete.

Do you have a vision of your future kitchen but are unsure of where to start? Call our office on 0151 345 5859 and we can help get the ball rolling for you today!