Case Study #6

Case Study #6

This was a fully project managed timber frame side extension in Spital that we completed in February 2016.

The extension included two en suites to two bedrooms upstairs, one of which included a dressing room. We were contracted to remove the existing flat roof, followed by constructing the new extension with a pitched roof. We covered the roof with concrete tiles, provided new fascia, soffits and gutters to match the existing, and also installed five white uPVC windows alongside a Velux sun tunnel. As well as this, we fully coordinated the structural works, plastering, electrics, plumbing and internal joinery.

The entirety of the project was completed in just 6 weeks, leaving a highly satisfied customer who as a result was able to enjoy their brand new space with their family throughout the Easter holidays.

Do you have an idea for what kind of extension you would like adding to your property? Call our office on 0151 345 5859 and offload some of your ideas today!

C

   

No Comments

Sorry, the comment form is closed at this time.